System Size: 240kw
Panels: Sunpower Maxeon 350w x 685
Inverters: SMA STP25000TL x 8
Racking: Clenergy – 20degree Tilts screwed to Tin interface, Flat to roof
Monitoring: SMA energy meter connected to sunny portal
Installation Duration:19 Working days
CASE STUDY:
MIDWEST FOODS 240kW
Although looking like a straightforward installation from above, this project proved to be a complex construction. With engineering constraints for roof loading, Crane lifts for module access to roof. Customise inverter station hidden behind pallet racking.
Midwest foods is local Dubbo distributor, Seeing high traffic in and around site with trucks and forklifts constantly in and out meeting strict deadlines. ME delivered this project seamlessly with perimeters fenced and clearly marked, crane lifts completed after hours and constant communication with management throughout the whole installation process.
Safety was a focus on this build, ME worked closely with safe work NSW local Dubbo inspector to ensure our team were not only working compliant but at the highest level of safety. With a lot of moving parts to this project simple risks could of easily been overlooked. ME purchased and used our very own Commercial edge protection which we still use to this day on all our installations that it is required.
Other Projects
-
Club Dubbo 100kW
In 2020 Club Dubbo contacted Macquarie Energy to procure a commercial solar installation.
-
NDF Narromine 100kW
In 2017 NDF Engineering Narromine, NSW. Contacted Macquarie Energy to procure a commercial solar installation.
Contact us.
angus@macquarieenergy.com.au
(02) 6881 9661
1/48 Mountbatten Drive
Dubbo, 2830